Welcome to Metrobus Croydon Blog

Sunday, 16 July 2017

ROUTE 63

July 16th, 10:39:23 pm
UPDATED

BLACKFRIARS ROAD SE1

2239hrs,

Routes Affected: 45,63,388

Road blocked Northbound due to a broken down bus,

From Blackfriars Road, L Stamford Street, R Waterloo Bridge, A Lancaster Place, R Aldwych, L Strand, A Fleet Street to Ludgate Circus LOR

Diversion Reference D3018

Route 321

Due to a serious R.T.C in Cray Road between a bus and car the road is close in both directions . Diversion via Crittalls Corner ,Edgington Road left Maidstone Road ahead Footscray Road ahead Sidcup Hill to line of  route.
TJ

P12 LOWER ROAD

17:35 - 18:00

LOWER ROAD TO SOUTHWARK PARK ROAD

TRAFFIC DELAYS


7 TO 12 MINS

NR

225 ROUTE

(12:30 -          )  8 TO 11 Minute delays Brookmill road  through  to Deptford broadway
(12:30 -     15:55      ) 3 to 6  minute isolated delays in both directions
(12:30-      15:55 ) 5 to 7  minute delays deptford broadway through to brookmill road

ROUTE 171 HOLBORN DEPARTURES

DELAYS DEPARTING BLOOMSBURY STAND TO KINGSWAY DUE TO PARKING AND CONGESTION IN ALDWYCH WITH THE CLOSURE OF WHITEHALL FOR A PLANNED EVENT.

POSTED BY PE CLEARED AT 17:00

P12 PECKHAM RYE

13:25

PECKHAM RYE EMERGENCY ROADWORKS

10 TO 15 MINS BOTH DIRECTIONS

NR

ROUTE 37 PECKHAM RYE EMERGENCY ROADWORKS AND TEMP ATS

TRAFFIC TAILING BACK INTO EAST DULWICH RD 12 TO 15 MINS DELAYS,

POSTED BY PE.

DELAYS INCREASED FROM 14:00 15 TO 25 MINS VERY ERRATIC.

POSTED BY PE  CLEARED AT 19:00

ROUTE 37 LAMBETH COUNTRY SHOW

SPORADIC TRAFFIC DELAYS,PARKING ISSUES AND HEAVY LOADINGS REPORTED RE NOE SO17/3319, 12 TO 15 MINS TOWARDS BRIXTON.

POSTED BY PE,

DELAYS INCREASED FROM 14:00 15 TO 20 MINS.

Route 225 Brookmill Road / General Delays

From 11:00

Route is encountering isolated delays in both directions through Brookmill Raod and along the whole route in general.

Average delays between 8 and 12 minutes.

DB

Route 63

09:30 - 13:30
Blackfriars Road (Bridge), Southwark Street NOE: SO17/3203
Delays northbound 3 - 5 mins.
Delays southbound 5 - 8 mins. Delays are erratic due to the traffic intermittently tailing back to New Bridge Street.

Update 13:30
Blackfriars Road (Bridge), Southwark Street NOE: SO17/3203
Delays northbound 10 - 12 mins.
Delays southbound 5 - 8 mins. Delays are erratic due to the traffic intermittently tailing back to New Bridge Street.

Route 63

11:10 - 11:45
Acton St, Gray's Inn Road northbound. RTC Euston Road involving a bus.
5 - 10 mins

Route 37-63-P12-363. Peckham rye through rye lane

09:45hrs- Temp ATS at Nigel road causing tailbacks along peckham rye

Delays 8-10mins


                                                              UPDATE

12:00hrs- Delays increased to 9-14mins


MH

Rye Lane / Hanover Park NOE SO17/2511 - Routes 36, 171, 436

as of 05:00

NOE has over-run and diversion is still in place towards Camberwell.

Called CentreComm and spoke to Steve who stated that they have no expected time of re-opening.

Called C/Com @ 08:08, spoke to Ice, NOE noted as clear and to put buses back to LOR.

DB